Showing posts with label 2nd week. Show all posts
Showing posts with label 2nd week. Show all posts

Sunday, June 21, 2009

Week Two: Timberframing (part three) Raising Day!

Raising the first bent into place.





























Bringing up the rafter plates

















The two hemlock tiebeams which span the whole structure are too heavy for us to lift so we got a backhoe to lift them into place while people at either end guided the mortise and tenon together.

The students took over the raising after this section was together- asking the instructors to let us put what we learned to use. They said if we could do it we'd get beer!


Almost done!








A group pictures at the end of the day. The small branch at the peak of the end of the roof is an old druid tradition giving thanks for the trees used in the construction. As the "fair maiden" of the class I was asked to tack it to the highest point on the structure.








We were successful!



Friday, June 19, 2009

Week Two: Timberframing (part two)

Now it's time to make a mortise for your tenon!

Sawr (saw) it, score it and bore it!
Here's me working with one of the really old boring machines








Once I've bored it and cut out all the space within my outline it looks like this.







Then I cut the housing and it's done!


Week Two: Timberframing (part one)

Layout your post in pencil directly on the lumber











Saw your kerf











Chisel out the extra stuff using a mallet to take out big chunks










Make it smooth with your chisel by paring it (or use a rabbet plane)







Then do the other side, taper and chamfer it and you have a tenon!